|
03-30-2009, 03:02 AM | #1 |
Adjusting to the Life
|
My old project finished
Hello all, I started redoing this at CS last summer. I never really checked back in with you guys so here is pretty much the set up. I have put lights in the ceiling on a dimmer switch and also insulated the whole closet. I used greenboard drywall with a vapor barrier and used 3/4 in. spanish cedar throughout the entire closet. I also found this wine cooling unit that that works great. Its designed to fit right between the studs on the top of the door. For humidity I am running a 2 gallon Hamilton Beach Humidifier which I haven't run into any probs yet.
All in all the Temp stays at 66F and 68RH. I'm very happy the way it came out. I just need time to fill it lol. Thanks for letting me share. |