Cigar Asylum Cigar Forum  

Go Back   Cigar Asylum Cigar Forum > Cigar Forums > Accessory Discussion / Reviews

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 03-03-2018, 01:43 PM   #11
Da Klugs
Juan of 11
 
Da Klugs's Avatar
1
 
Join Date: Oct 2008
First Name: Dave
Location: Right here
Posts: 4,222
Trading: (8)
RA
Da Klugs has disabled reputation
Default Re: Finally

Things are moving along.

Installed the bar counter top and sink.



Backsplash later this week, appliances are scheduled for Friday.



Couple pieces of furniture showed up yesterday.



Painter comes to stain and finish all the woodwork on Monday. Figure by Friday the smoke room is almost ready to decorate.

Grandkids play / study areas got installed Friday.



Few more weeks and maybe the contractor will finally be gone.

Stair Railings are this weeks project.



And maybe build some more singles drawers for the island.



More room than I needed for wine.. not enough for singles / loose CR.
__________________
Communities Not Commodities.
Punctuation challenged, but trying. Proud winner of phase 1 of the Weight loss contest
Da Klugs is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 11:45 PM.


Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
All content is copyrighted jointly by Cigar Asylum and the content provider.