Quote:
Originally Posted by Rabidsquirrel
2008 code requires arc faults on anything not a GFI.
-edit-
To answer the other question, from what I can read in the code, it seems like you need to take a number 10 to your ground. If you have a separate ground rod for your satellite dish, you need to bond that to your service ground with the number 6 you mentioned.
|
Are there any NEC guidelines on burying the #6 ground wire, i.e. depth of cover, distance from drip line, type of wire, etc.?