Haven't had to many updates the last couple days. Some nights I haven't been able to get down to work on it because of real life work.

The first picture below shows 2 (well.. now 1) vents that fed air into the unfinished area. These are being located to the wall next to the HVAC equipment and outside of the Lounge. Both are now removed from the walls.



The biggest change that had to take place was additional 2x2 framing on the front wall (see picture one for a completed 2x2s -- more description and explanation below). This is the wall that was pre-existing from the builder. While I have little complaint about the builder who built the home (then again the house is only 3 months old), they didn't do the quality job any of us would want in our home.

Everything on the top two levels is "modular".. modular in the sense that the rafters, floor joists, wall panels, etc all arrive pre-assembled and then put together like a big puzzle. The basement (since it's an option and not in all homes) is stick built per order.

The finished side of the back wall is not exactly plum... nor are any of the boards really level. That being said, both items combined introduced a big problem as you will see in the picture below:




If you look VERY VERY closely (at picture 1) you will notice that the metal beam in the second picture comes out beyond the 2x4 studs. Due to the fact that most of the boards they used are very twisted (again, see bad boards and bowing in second picture), it also meant the drywall was right up against the front side. I wouldn't be able to put drywall on this side, nor could I run wire.

The solution was to frame the front wall with 2x2 boards (I cheated and cut down my extra 2x4s down on the table saw since I didn't feel like going to the store). I was able to also straighten up the walls since I built mine square.



I am expecting my HVAC guy on Tuesday. At this point the new circuit in the exercise room is run, all outlets and can lights are operational.

I have also run all of the wire in the Lounge. The outlets are all hooked up. Since the wire is 12/2 and a bit thicker I need to pick up some larger wire nuts so I can hook up the switches safely. Will pick those up tomorrow. Once the switches are connected I will install the 20A breaker. All of the wire is run for the Wall Sconces, however I capped off the lead wires in the first sconce so I can turn on the breaker once installed and use the outlets while working.

Until next time.