View Single Post
Old 07-09-2009, 08:59 AM   #4
TheTraveler
giggity giggitty
 
TheTraveler's Avatar
1
 
Join Date: Oct 2008
First Name: Jonathan
Location: Near a Walmart
Posts: 1,813
Trading: (12)
MarineCorps (Served With Honor)
TheTraveler has a spectacular aura aboutTheTraveler has a spectacular aura about
Default Re: Grumble Grumble Gripe

Quote:
Originally Posted by BlackDog View Post
Because of the extra lumber, and because of my son's special needs (ie: handicap), my city is charging me an extra $196 for the building permit so they can do additional inspections during the contruction process. Bastages.
What a crock of #*%@ ! There isn't any extra equipment, extra time, extra effort, extra ANYTHING involved in that inspection!!! The inspector looks at the construction methods, bracing, size lumber used, etc no matter what. Are the handrails above X height? Yes. Are the spindles/balusters spaced properly? Yes. Did he use the correct size joists for the span? Yes. On and on like that. No extra questions (that I know of) that need to be answered - to him a deck is a deck and it needs to be inspected, end of story.

Are you installing something extra, like an elevator/lift, that might be the cause for "extra" inspection?
__________________
"My life is my own."
TheTraveler is offline   Reply With Quote