Re: and the construction has begun
dude, between the 3 trips to bangladesh, work here in the states and house stuff.
it's hard to find time to poop.
I am doing the rip our and wiring re-rough in. the wall between the two rooms is coming down to make one "great room". I have contractor coming in to do the beam, drywall, mudding and floor (patching, sanding, staining, sealing).
then we will paint.
|