So it's been awhile, work during the holidays kinda slowed down. Did a few minor, cosmetic sort of finishes. Got the walls painted, the windows trimmed, built a low shelf around the top of the concrete, installed shelving in the pantry and enclosed the upper level storage with some sliding doors.
Had to wait on some funds before starting the floor. Spent the last two weekends on that job:
Laying the vapor barrier & underlayment-that was a big pain in the butt.
Here's a look at the partial floor install
I ran the table saw, Lisa does better snapping things in place.